NIP draft methodology

WWTP energy assessment methodology and assessor requirements

A procedure for regular energy assessment of wastewater treatment plants and related sewerage infrastructure. The draft sets out the assessment scope, assessor requirements and the proposal and economic evaluation of energy-saving measures.

The PDF could not be displayed in this browser. Open the document in a new window.