For professionals

Obligations, deadlines and practical preparation for operators, infrastructure owners, municipalities and public authorities.

How agglomerations are delineated

An agglomeration boundary is based on the amount of pollution generated in a location and its relationship to wastewater collection, rather than simply copying municipal administrative borders.

An agglomeration is not a municipality

An agglomeration is an area where population or economic activities are sufficiently concentrated for it to be economically and technically meaningful to collect urban wastewater and convey it to a treatment plant or final discharge point. Its boundary therefore need not follow municipal borders.

European water protection — how do directives and river basin plans fit together?

River basin plans are the central coordinating tool for water protection, translating the objectives of European directives into concrete, spatially coordinated measures within individual river basins.

Select a document in the map or a relationship below it. The explanation panel identifies your selection and shows how the documents are connected.

Document map

Strategic

What we want to achieve

Integration and planning

How to coordinate basin measures

Implementation

What each instrument addresses

Selected relationship: Urban wastewater → drinking-water sources

Selected relationship explained
Urban wastewaterDrinking water

Why do drinking-water sources matter for WWTP requirements?

(EU) 2024/3019 · (EU) 2020/2184

Urban wastewater can introduce nutrients, pathogens, micropollutants and other substances into abstraction catchments. The UWWTD explicitly addresses this relationship through risk management.

What this means

  • Abstraction catchments are provisionally included among areas at risk from micropollutants unless a risk assessment demonstrates otherwise.
  • Permitting industrial wastewater discharges to sewers must take risks to abstraction catchments into account.
  • Article 18 requires an assessment of urban wastewater impacts on water used for drinking-water abstraction.
  • Outcomes may include prevention at source or stricter wastewater treatment.
How does it connect to the others?

Relationships between documents

Selecting a relationship connects the relevant documents with a blue line in the map and opens their shared explanation.

Find out what applies to you

Postcodes prefill the agglomeration size. Enter the plant load, infrastructure and area status manually if known. Unknown inputs leave the relevant obligations marked as needing checking. Agglomeration size is not the load of a specific treatment plant.

Sensitive and risk areas

Results update automatically. This button takes you to the summary and earliest relevant period.

Obligation overview

Complete the form to see results for your operation.

Basic overview8 periods

from preparation to long-term objectives

More calculators

Calculations and working tools for professionals

Directive interpretations

Detailed explanations of each topic

Obligation timeline

Select a period and browse the Directive overview.

2027–2028

Preparation and planning

Baseline mapping, the national programme, sensitive areas and first audits.

13 items
PPlanning and system5 items
TWastewater treatment2 items
EEnergy and emissions1 items
DMonitoring and data5 items

This output is indicative and does not replace an individual legal assessment.