Secondary treatment removes biodegradable pollution. The recast Directive extends collection and treatment requirements to agglomerations from 1,000 p.e.

Compliance is not completed when construction ends: performance must be demonstrated through representative operation and monitoring.

Timeline

Obligations and their practical meaning

Each block has a permanent link. Always verify the exact scope against the agglomeration and plant profile and the final Czech implementation.

First requirements

Provide biological treatment and demonstrate continuing compliance with the required effluent performance.

Preparation: by 2035#secondary-preparation-2030

Secondary treatment

Provide biological treatment and demonstrate continuing compliance with the required effluent performance.

What this means in practice

Verify actual agglomeration load, current treatment level, capacity margin, project readiness and procedures for sampling and corrective action.

  • Treatment-level records, representative samples and compliance results.
  • Implementation period: 2030.
  • Keep the evidence traceable and ready for reporting.

Scope and evidence

Who it applies to: Agglomerations from 1,000 p.e., including the newly covered 1,000–1,999 p.e. category.

Evidence: Treatment-level records, representative samples and compliance results.

Why this step matters

Extending secondary treatment reduces organic pollution from smaller settlements that were outside the previous minimum scope.

Broader requirements

Provide biological treatment and demonstrate continuing compliance with the required effluent performance.

Preparation: 2032–2033#secondary-preparation-2033

Secondary treatment

Provide biological treatment and demonstrate continuing compliance with the required effluent performance.

What this means in practice

Verify actual agglomeration load, current treatment level, capacity margin, project readiness and procedures for sampling and corrective action.

  • Treatment-level records, representative samples and compliance results.
  • Implementation period: 2032–2033.
  • Keep the evidence traceable and ready for reporting.

Scope and evidence

Who it applies to: Agglomerations from 1,000 p.e., including the newly covered 1,000–1,999 p.e. category.

Evidence: Treatment-level records, representative samples and compliance results.

Why this step matters

Extending secondary treatment reduces organic pollution from smaller settlements that were outside the previous minimum scope.

Infrastructure expansion

Provide biological treatment and demonstrate continuing compliance with the required effluent performance.

Milestone: 2035#secondary-small

Secondary treatment

Provide biological treatment and demonstrate continuing compliance with the required effluent performance.

What this means in practice

Verify actual agglomeration load, current treatment level, capacity margin, project readiness and procedures for sampling and corrective action.

  • Treatment-level records, representative samples and compliance results.
  • Implementation period: 2035.
  • Keep the evidence traceable and ready for reporting.

Scope and evidence

Who it applies to: Agglomerations from 1,000 p.e., including the newly covered 1,000–1,999 p.e. category.

Evidence: Treatment-level records, representative samples and compliance results.

Why this step matters

Extending secondary treatment reduces organic pollution from smaller settlements that were outside the previous minimum scope.

Stricter targets

Provide biological treatment and demonstrate continuing compliance with the required effluent performance.

Delivery: ongoing#secondary-ongoing-2036

Secondary treatment

Provide biological treatment and demonstrate continuing compliance with the required effluent performance.

What this means in practice

Verify actual agglomeration load, current treatment level, capacity margin, project readiness and procedures for sampling and corrective action.

  • Treatment-level records, representative samples and compliance results.
  • Implementation period: 2036.
  • Keep the evidence traceable and ready for reporting.

Scope and evidence

Who it applies to: Agglomerations from 1,000 p.e., including the newly covered 1,000–1,999 p.e. category.

Evidence: Treatment-level records, representative samples and compliance results.

Why this step matters

Extending secondary treatment reduces organic pollution from smaller settlements that were outside the previous minimum scope.

Advanced implementation

Provide biological treatment and demonstrate continuing compliance with the required effluent performance.

Delivery: ongoing#secondary-ongoing-2039

Secondary treatment

Provide biological treatment and demonstrate continuing compliance with the required effluent performance.

What this means in practice

Verify actual agglomeration load, current treatment level, capacity margin, project readiness and procedures for sampling and corrective action.

  • Treatment-level records, representative samples and compliance results.
  • Implementation period: 2039.
  • Keep the evidence traceable and ready for reporting.

Scope and evidence

Who it applies to: Agglomerations from 1,000 p.e., including the newly covered 1,000–1,999 p.e. category.

Evidence: Treatment-level records, representative samples and compliance results.

Why this step matters

Extending secondary treatment reduces organic pollution from smaller settlements that were outside the previous minimum scope.

Energy transition

Provide biological treatment and demonstrate continuing compliance with the required effluent performance.

Delivery: ongoing#secondary-ongoing-2040

Secondary treatment

Provide biological treatment and demonstrate continuing compliance with the required effluent performance.

What this means in practice

Verify actual agglomeration load, current treatment level, capacity margin, project readiness and procedures for sampling and corrective action.

  • Treatment-level records, representative samples and compliance results.
  • Implementation period: 2040.
  • Keep the evidence traceable and ready for reporting.

Scope and evidence

Who it applies to: Agglomerations from 1,000 p.e., including the newly covered 1,000–1,999 p.e. category.

Evidence: Treatment-level records, representative samples and compliance results.

Why this step matters

Extending secondary treatment reduces organic pollution from smaller settlements that were outside the previous minimum scope.

Long-term objectives

Provide biological treatment and demonstrate continuing compliance with the required effluent performance.

Delivery: ongoing#secondary-ongoing-2045

Secondary treatment

Provide biological treatment and demonstrate continuing compliance with the required effluent performance.

What this means in practice

Verify actual agglomeration load, current treatment level, capacity margin, project readiness and procedures for sampling and corrective action.

  • Treatment-level records, representative samples and compliance results.
  • Implementation period: 2045.
  • Keep the evidence traceable and ready for reporting.

Scope and evidence

Who it applies to: Agglomerations from 1,000 p.e., including the newly covered 1,000–1,999 p.e. category.

Evidence: Treatment-level records, representative samples and compliance results.

Why this step matters

Extending secondary treatment reduces organic pollution from smaller settlements that were outside the previous minimum scope.

Related content

Interpretations and important terms

Find more detail on legal concepts and the Czech approach in the related interpretations and glossary.