Media resources

For journalists

What the recast Urban Wastewater Treatment Directive will mean for municipalities, households and the environment.

Main changes

What the new Directive will bring

The recast Directive aims to improve river water quality and strengthen protection of human health and the environment. It extends treatment to smaller agglomerations, tightens nutrient removal, introduces targeted micropollutant removal and supports better rainwater and energy management.

Municipalities and residents

Wastewater treatment in smaller agglomerations

The recast Directive extends wastewater collection and treatment requirements to smaller agglomerations, helping protect rivers and streams in less densely populated areas.

Wider coverage

The threshold for collecting systems and secondary treatment falls from 2,000 to 1,000 population equivalents (p.e.).

More context

An agglomeration may cover part of a municipality, one whole municipality or several municipalities. The basic deadline for agglomerations from 1,000 to below 2,000 p.e. is the end of 2035, subject to the conditions set by the Directive.

More about agglomerations
Health and the water environment

More effective micropollutant removal

An additional treatment stage will target trace substances such as residues from medicines and cosmetics that can harm aquatic ecosystems and pose risks to human health.

Performance of the new treatment stage

The required average removal rate for the specified set of substances is at least 80%.

More context

Quaternary treatment will be introduced progressively by 2045 at all plants from 150,000 p.e. and at plants serving agglomerations from 10,000 p.e. in areas where micropollutants present a risk under the Directive.

More about quaternary treatment
Financing

Medicine and cosmetics producers will contribute

To prevent households from bearing the additional treatment costs alone, the Directive involves producers whose products contribute to micropollutant contamination in financing the additional treatment, applying the polluter-pays principle.

Producers’ share of the costs

Producers participating in the scheme must cover at least 80% of the defined costs of quaternary treatment and related monitoring.

More context

Contributions cover investment and operating costs for additional micropollutant treatment, related monitoring and defined costs for collecting and verifying product data.

More about financing
Energy and operation

More efficient plants with more own energy

Wastewater treatment plants consume energy but can also generate it. The Directive calls for energy savings and more renewable energy generation.

Energy neutrality by 2045

Annual renewable energy generation should cover the consumption of the plants concerned in the national balance.

More context

The target is assessed nationally for plants from 10,000 p.e. It includes electricity and heat on both the generation and consumption sides, with interim targets and conditions for exemptions.

More about treatment-plant energy
  1. The Directive entered into force

    The new European framework for urban wastewater treatment began to apply.

  2. Transposition into national law

    Deadline for Member States to transpose the requirements into national legislation.

  3. National implementation programme

    The programme will connect the measures, investment and financing needed.

  4. Progressive delivery of the main targets

    Treatment and energy requirements are phased in according to plant size and local conditions.

Materials for Czech implementation

Published draft methodologies cover agglomeration delineation, plant load and energy assessment.

View methodologies and documents
Why do we need new wastewater treatment rules?

The previous European rules were introduced more than thirty years ago. Wastewater treatment has improved considerably since then, but new challenges have emerged: pharmaceutical residues and other micropollutants, microplastics, and the need to manage water and energy more efficiently. The recast Directive extends and strengthens requirements to better protect the water environment and human health.

Will more wastewater be treated than today?

Yes. Collection and treatment requirements will progressively extend to smaller agglomerations from 1,000 population equivalents (p.e.). This lowers the threshold compared with the previous rules, which focused mainly on larger agglomerations. The aim is to make effective wastewater treatment standard in smaller settlements too.

Does every municipality with over 1,000 residents need its own treatment plant?

Not necessarily. The Directive uses the concept of an agglomeration, rather than simply the population of one municipality. This is an area where settlements, industry and other wastewater-generating activities are concentrated enough for wastewater to be collected and treated together. In exceptional cases, such as where a common sewer is technically impracticable or disproportionately costly, individual systems may be used. They must provide the same level of environmental and health protection as collective treatment, with proper operation and inspection.

Will treatment plants also remove medicines and other chemicals?

Selected larger plants will. The Directive introduces quaternary treatment to substantially reduce selected micropollutants, such as pharmaceutical residues and substances used in cosmetics, that conventional biological treatment cannot remove sufficiently. These substances can pose risks to aquatic ecosystems and human health even at very low concentrations. Water is part of one connected cycle: wastewater treatment in one place directly affects the quality of drinking-water sources elsewhere.

Who will pay for new micropollutant-removal technologies?

Producers of medicines and cosmetics are expected to cover a significant share through extended producer responsibility (EPR). Following the polluter-pays principle, the Directive requires producers in these sectors to cover at least 80% of the defined costs of quaternary treatment and related monitoring.

Will the Directive make rivers and lakes cleaner?

That is one of its main aims. As well as addressing micropollutants, it tightens requirements for nitrogen and phosphorus removal. These nutrients can cause eutrophication: excessive growth of algae and cyanobacteria that reduces water quality in rivers and lakes.

What does energy neutrality mean for treatment plants?

The Directive aims to reduce the sector’s energy demand while increasing its energy generation. Wastewater contains energy as heat and in chemical form. Plants can use biogas, solar power, heat pumps and other renewable sources. The energy-neutrality target is assessed through the national balance of the plants concerned; it does not require every individual plant to be self-sufficient.

Can wastewater help us monitor epidemics?

Yes. Wastewater carries information about the population connected to the sewer and can provide early warning. The Directive provides for public-health surveillance, including monitoring selected viruses or antimicrobial resistance genes. This approach has already proved useful in tracking COVID-19. How early a signal is detected also depends on sampling frequency and the speed of analysis.

Will the new Directive increase wastewater charges?

It will bring new investment and operating costs, but the effect on charges will vary. The work needed depends on the condition of local sewers and treatment plants; overall costs also depend on financing and how European rules are transposed into Czech law. Some measures, particularly in energy management, can reduce operating costs. Producers of medicines and cosmetics are also expected to contribute to removing selected micropollutants.

When will people notice the changes?

The changes will be gradual. The Directive sets phased deadlines for the main measures up to 2045. Czechia must transpose the European rules into national law and prepare an implementation programme. Some measures will become visible within a few years, while others will take decades. Specific obligations and deadlines depend on size and local conditions.

What does wastewater treatment have to do with rain?

Heavy rain can bring more water into sewers than they can safely convey. The Directive therefore connects sewer planning with measures that retain water, support infiltration or slow runoff.

Media resources

Materials for your work

Impacts of the Directive and implementation programme

A seminar on the implications of the new requirements for water-infrastructure owners and operators.

Water Supply and Sewerage Operations 2026

The specialist conference in Brno will also cover implementation of the recast Directive.

People and organisations

Who is behind the information project

Ministry of Agriculture logo
Project coordination

Ministry of Agriculture

Provides the main coordination of the information project.

Ministry of the Environment of the Czech Republic logoMinistry of Health logo
Co-lead authorities

Ministry of the Environment and Ministry of Health

Work with the Ministry of Agriculture on preparing the programme.

University of Chemistry and Technology, Prague logoThe Water Supply and Sewerage Association of the Czech Republic logoUnicorn Systems HSI s.r.o. logoFaculty of Civil Engineering, CTU in Prague logo
Expert support

Universities and sector partners

The project brings together expertise from UCT Prague, SOVAK ČR, Unicorn Systems HSI and CTU in Prague.

How the implementation materials are developed

Led by UCT Prague, the consortium connects expert proposals with data and practical experience. UCT Prague, SOVAK ČR, CTU in Prague and Unicorn Systems HSI jointly prepare the outputs.

  1. Expert proposals

    Dozens of specialists from utilities, universities, public authorities and river basin authorities work on agglomeration boundaries, sensitive and risk areas, surveillance, treatment capacity, energy, legislation, economic modelling and producer responsibility.

  2. Validation in practice

    Municipalities, operators and regions validate data, agglomeration boundaries and proposed measures. Consultation also involves infrastructure owners, pharmaceutical and cosmetics producers, the European Commission and other Member States.

  3. Joint outputs

    The consortium integrates the working groups’ results into materials for the national implementation programme and transposition into Czech law. Feedback from practice returns to the experts for refinement.

How the work is coordinated

The consortium coordinates weekly and meets with the ministry every two weeks. Expert groups meet regularly and as needed. Results are shared through seminars, updates and the website.

About the project and participating organisations
Contact

Preparing an article or interview?

Tell us what you are working on, your publication and your deadline. The project team will direct the question to the relevant expert.

Contact the project team